Bac Lieu: Completion of 7.5kW–25kPa Turbo Blower Installation | First Project Converting from Single-Phase to Three-Phase Power
Notably, in this project, Aqua Mina deployed the first unit converted from a single-phase to a three-phase power system, enhancing operational efficiency, reducing electrical load, and establishing a more stable foundation for the farming system in the future.
Project to provide 24 MOBILE WATER TANKS D4 and D6 in Van Ninh, Khanh Hoa
Completed Mobile Round Tanks Construction Projects
Installing equipment for high-tech shrimp farming in Vinh Hau commune, Hoa Binh district, Bac Lieu province, Vietnam.
Construction of composite round tanks project in Darwin, Australia
Darwin is the capital of the Northern Territory of Australia, situated next to the Timor Sea. It is the largest city in the Northern Territory. Darwin has a tropical climate, quite similar to Southeast Asian countries, with two distinct seasons, the wet season and the dry season. This is the location chosen by the international CSIRO to establish a research project on Tiger Prawn.
Construction of Mobile Round Tanks Using the Recirculating Aquaculture System (RAS) Model for Shrimp Farming in Krong Buk, Đăk Lăk.
Supply and Installation of 50 Mobile Round Tanks (7m3) Using for Raising Snakehead Fish in Ia H’Drai District, Kon Tum Province, Vietnam.
Supply 100m3 and 300m3 Water Storage Tanks for Long Son Petroleum Industrial Investment Jsc. Ba Ria - Vung Tau, Vietnam
Project: Supply 100m3 and 300m3 Water Storage Tanks for Long Son Petroleum Industrial Investment Jsc. Ba Ria - Vung Tau, Vietnam
Supply 100m3 Mobile Round Tanks in Cao Lanh City, Dong Thap Province, Vietnam
Construction of Mobile Round Tanks for Chitala Chitala Fish in Chau Phu District, An Giang Province
Supply 157m3 Mobile Round Tanks in Cu Chi District, Ho Chi Minh City, Vietnam
Dự án cung cấp 4 hồ nuôi cá tại Cty NVBP tại huyện Châu Phú, tỉnh An Giang











